|
|
 |
MILESTONES |
 |
| |
The idea to build ultralight aircraft provided with a shape
and performances similar, or better, with respect to the general
aviation ones, has born into a group of amateur builders within
the half of nineties. Starting from "Asso" aircraft
project design, the constructive technique has been developed
step by step.
|
|
| |
| 1998 |
 |
| |
| Coming from Asso experience,
The Pioneer 300: ultralight aircraft which gains the
Profilo, with refined technical solutions and high
levelled performances which lead it to the top of
the range.
Retracting landing gear, motor flaps, tapered wings,
carbon fuselage, wing tanks, together with 300 Km
per hour of VNE, lead the Pioneer 300 to represent
the new standard within the high-levelled range of
pleasure-aircrafts.
|
|
The wood together
with new materials allows Pioneer 300 to remain within
the ultralight aircraft load foreseen by Rules.The
first engines installed are the MID-WEST ones. This
is a new for the ultralight aircraft world too.The
first fly-test is done and the article appeared into
"VOLARE" magazine is a concentrate of appreciations
for Pioneer 300. |
|
|
| |
| 1999 |
 |
|
|
| It's time to grow up ALPI AVIATION
SRL is founded to penetrate a market which requires
more and more performing aircrafts.
The natural site of the company is located into the
wide area of La Comina near Pordenone. Place plenty
of historical aviation landmarks: here in1910 has
born the first Italian Flight School.
|
|
The productive line
of Pioneer 300 starts. The workmanships are a mix
of craftsmanship and industrial dynamism. In the productive
process are now involved selected suppliers following
their quality skill.The first order comes: Germany!
A great challenge for ALPI AVIATION because of the
severe tests to which the aircraft is undergone to
obtain the desired BFU (German Certification). Challenge
agreed and won! |
|
|
| |
| 2000 |
 |
|
|
| Orders come more and more thanks
to the marketing campaign by means of the participation
to the main air shows where ALPI AVIATION booth is
always the hit of the mark.Into the most famous air
show fair all over the world in Florida, the SUN'&'FUN,
Pioneer 300 catches the interest of the US people.
Within the end of the year the first four aircrafts
are bought to the States.In the meantime the foundation
for an innovative aricraft is prepared: the PIONEER
200.
|
|
|
|
| |
| 2001 |
 |
|
|
| As PIONEER 300 conquerors involves
more and more people: it is exported to Spain, France,
Luxembourg, and of course Germany and USA, PIONEER
200 has born. This aircraft inherits from its brother
the low wing and several details.
Without changing the qualitative level of the components,
has born a simple and fast ultralight aircraft.
|
|
A strict costs policy
permits to propose it to a public with the lower cost
related to its performances. The Flight Schools' interest
is the most evidence. |
|
|
| |
| 2002 |
 |
|
|
| ALPI AVIATION SRL production
is increasing and the new and modern company plant
has born to satisfy the new markets requiring "Pioneers".
NEW ZEALAND, SOUTH AFRICA, CANADA e BELGIUM are just
some Countries of the new ALPI AVIATION dealers.
|
|
|
|
| |
| 2003 |
 |
|
|
| The future is today. It is
foreseen the productive growing and the market spreading.
All quality standard efforts to improve our aircrafts.
An Engineering Team undergoes all "Pioneers"
to all tests foreseen for foreign countries.
|
|
New projects are analysed to increase the market area of ALPI
AVIATION, today first in Italy. |
|
| |
|
|
| |
| 2004 |
 |
|
|
| One of the best year for the
factory that permitted to strongly grow up and develop
a new family product, the aerobatic Pioneer 330 and
a new and cheaper Pioneer 200 version equipped with
the well known Sauer engine.
During this year the factory got the UK, JAR-VLA standards
certification, a strongly and severe certification
standard, really pursued and finally obtained as a
relevant objective. In the same year, the factory
started also the Pioneer 200 certification with respect
to the same standard, planning to get the final approval
in the 2005.
|
|
During that year the factory started a foreign countries commercial
activity relaunch program and new research and development
programs.The factory facilities are growing-on fallowing the
market, the Croatian Alpi factory has been renewed and enlarged
with a completely new shed that permits an higher production
rate for the wood structure that involves the higher man hours
amount during the manufacturing process.
The factory research and development future plans, partially
started, will give the needed capability of introduce new
innovative and performing models.The factory growing process
is represented by the ISO UNI 9001-Vision certification, that,
during the year ended the documentation preparation phase
planning to get the final certification in the 2005. |
|
| |
|
|
| |
| 2005 |
 |
|
|
|
In April the aimed and relevant ISO UNI 9001-Vision
certification objective has been reached after two
days of inspections and verification by the DNV certification
authority, one of the most severe in Europe.
The Croatian factory is working very well and the
production is going to rise quickly keeping at the
same time an higher quality standard fro the whole
production cycle.
The Pioneer 200 is getting the final approval with
respect to the UK, JAR-VLA standards certification
that will become operative during this year. In the
early month of the year, the Pioneer 200 got also
the German BFU certification, one of the most severe
standards in Europe.
|
|
|
|
| |
The engineering activity
is going on keeping updated all the products and the related
technical documentation connected to them, flight manuals,
construction manuals, maintenance manuals, etc…
During the year, the continuously factory growing process
materialized in the new Pioneer 300 model, called Pioneer
300 Hawk, that, starting from the P300 base, has been modified
and improved in the comfort, look, avionics and some more
technical aspects. This new model got immediately a surprising
success going to be the factory top model.
Going on with respect to the certification activity and following
the new Sport Pilot Regulation in the USA, the factory started
the certification procedure that is still within its capability.
That certification, planned to be gotten during the 2006,
represent one of the best markets for the factory giving the
possibility to do another growing step in the overseas markets.
The year is not ended and some news will be filled with the
last factory progresses in the near future.
|
|
|
|
|